A cast-iron tub is dense enough that it usually leaves the light mixed debris bands. It is priced on the heavy schedule: a call-out plus weight. That is a different job from a laminate vanity or an acrylic surround. Photos of the tub and the path to the truck matter more than a vague tub removal request.
Homeowners in Toronto, York, and Durham use this when an older house still has a cast-iron clawfoot or a built-in tub and a new bath is going in. General contractors and bathroom remodelers use it when the old tub has to be out before install day. This guide is the tub only. A full bathroom tear-out, including the vanity, tile, and toilet, is the bathroom demolition cost guide.
Why a cast-iron tub is heavy
Cast iron is thick metal. Older houses in Toronto, York, and Durham often keep these tubs on an upper floor or in a basement, with narrow stairs and tight turns. Weight plus the stairs is what moves the quote. A ground-floor bath with a clear walk to the driveway is the simpler path. A flight of stairs, a landing, or a long carry changes the visit.
Whole tub or broken into pieces
When the path is clear and the crew can carry it, a tub can leave in one piece. On tight stairs, landings, or condo corridors, crews often break it into manageable pieces so it can be walked out safely. Breaking the tub adds labour time.
Neither approach is structural demolition. It is fixture removal. We do not cut into load-bearing walls, floors, or joists to get a tub out. We do not remove a slab, and we do not excavate.
This is selective demolition of one non-structural fixture. What a selective interior tear-out means is in the what is selective demolition guide. If the tub is already out and you only need it hauled, that is a renovation debris haul. Breaking a tub in a house people still live in throws dust. The interior demolition dust control guide covers how to keep that dust in the work room.
A plumber caps the lines first
A plumber shuts off the water and caps the supply and the drain before we touch the tub. If the water is still live, we do not pull the tub. We do not do plumbing, electrical, or gas work. A qualified trade does that disconnect. The work stays interior and non-structural.
How the price is built
There is no flat cast iron tub removal package price. Every figure below is before HST. HST is extra. Debris is priced by the load or by weight, never by the hour. The hourly rate is only for tear-out labour. The same ranges are on the pricing page.
Cast-iron tubs go on the heavy schedule: a call-out of $300 to $450, then about $100 to $160 per tonne after the allowance. If the load weighs more than the photos suggested, we re-quote from the scale ticket.
Tear-out labour after the time included with a full load is $100 to $150 per hour for a two-person crew. Breaking the tub up, and carrying pieces on stairs, uses more of this time. Each full load includes 60 to 90 minutes of loading and tear-out time.
Stairs, a basement, or a long carry to the truck add $50 to $150 or more.
If only light mixed scraps remain after the tub, such as vanity boxes that are already out or an acrylic surround elsewhere, that leftover haul still uses the light mixed bands. Before HST, a small pile is $99 to $150, an eighth of a load is $150 to $220, a quarter is $250 to $400, a half is $400 to $550, three quarters is $550 to $700, and a full load of about 15 cubic yards is $650 to $850.
If the plan also pulls tile on a mortar bed or a wet wall, that material is still heavy. It belongs with the bathroom demolition cost guide. This page does not re-price a full bathroom gut.
For general contractors, the tub should be out before the new unit arrives. The same visit can haul related demo debris that is already down. We're not a junk company. We're your site-clearing crew. Stop renting a bin. Hire a crew.
Scrap metal, older finishes, and permits
Cast iron can often be recycled as scrap metal once it is out. We haul it. Scrap handling follows what the load allows. We do not sell the metal for you. This page does not name a depot or quote a scrap payout.
Older baths can sit next to suspect tile, adhesives, or underlay. We never test for asbestos, and we never handle or remove it or any other hazardous material. If a designated substance survey is required under section 30 of Ontario's Occupational Health and Safety Act or Ontario Regulation 278/05, or if suspect material appears, we stop. Fuller bathroom context is in the bathroom demolition cost guide. This is not legal advice.
Fixture removal alone is usually not a permit decision: the City of Toronto lists repairing or replacing plumbing fixtures among work that does not need a permit and says that list is not exhaustive, so confirm the scope with Toronto Building or your contractor, or the local building department in York or Durham. The interior demolition permit guide is the longer note, and this is not legal advice.
Photos that get a written price
For a fast quote, send a full view of the tub, whether it is a clawfoot or a built-in, and a shot of the feet or the base. Show the path from the bath to the truck: stairs, turns, and door widths. If it is a condo, include the elevator and loading rules. Note what a plumber has already capped, and whether tile or the surround comes with the tub.
We confirm volume, access, and weight from those photos, then in writing, before anything is removed. Send them for a written price at https://junkofurs.com/quote. Great projects start with a clean slate.
Frequently asked questions
- How much does cast iron bathtub removal cost?
- There is no flat cast iron tub removal price. Before HST, a cast-iron tub uses the heavy schedule: a call-out of $300 to $450, then about $100 to $160 per tonne after the allowance. If the scale ticket is heavier than the photos suggested, we re-quote. Tear-out labour after the time included with a full load is $100 to $150 per hour for a two-person crew. Each full load includes 60 to 90 minutes of loading and tear-out time. Stairs, a basement, or a long carry add $50 to $150 or more. Light mixed scraps left after the tub are a small pile at $99 to $150, an eighth at $150 to $220, a quarter at $250 to $400, a half at $400 to $550, three quarters at $550 to $700, and a full load of about 15 cubic yards at $650 to $850. Photos give the written range.
- Will you carry a cast-iron tub out in one piece?
- When the path is clear and the crew can carry it, yes. On tight stairs, landings, or condo corridors, crews often break the tub into pieces so it can be walked out safely. Breaking it adds labour time. Either way, this is fixture removal. We do not cut into load-bearing walls, floors, or joists.
- Do you disconnect the tub?
- No. A plumber shuts off the water and caps the supply and the drain before we touch the tub. We do not do plumbing, electrical, or gas work.
- What if older tile or adhesive might contain asbestos?
- We never test for asbestos, and we never remove asbestos or other hazardous material. Older baths can sit next to suspect tile, adhesives, or underlay. If a survey is required, or if suspect material appears, we stop. That duty sits with the owner. This is not legal advice.
- Do I need a permit to remove a bathtub?
- Fixture removal alone is usually not a permit decision. The City of Toronto lists repairing or replacing plumbing fixtures among work that does not need a permit, and it says that list is not exhaustive. Confirm the scope with Toronto Building or your contractor. This is not legal advice.
Soft-strip, demo and junk removal
Ready to clear the clutter?
6 years GTA experience. Send a quote, get your price, then book the pickup. You pay after the job is done. We reply Monday to Saturday, usually within 30 to 60 minutes.
