Site Clear Plan

Keep new builds and renovations clear for the next trade

Home builders and site managers use this plan to clear a site between phases.

Packaging and debris from the last phase are hauled before the next trade starts.

How it works for builders

  1. Request it through the quote form. Include the site address and what needs to go.
  2. We load it, haul it and dump it within 24 hours.
  3. Your crew keeps working through the handoff to the next trade.
  4. Loading and dump fees are included.

Typical builder sites

Between phases on a new build

A new build is moving to the next phase, and debris from the last phase is still in the way.

Renovation handoff

A renovation has opened a room, and the next trade needs that room clear.

An active site

A busy build can need more than one pickup in the same week. Pro includes up to 4 pickups and up to 2 full truck loads.

Site Clear Plan

One flat weekly price. Request it through the quote form. We load it, haul it and dump it within 24 hours.

Basic

$749 / week

  • Up to 2 pickups
  • Up to 1 full truck load
  • Loading and dump fees included

Pro

$1,449 / week

Best for active sites

  • Up to 4 pickups
  • Up to 2 full truck loads
  • Loading and dump fees included

Good to know

  • A full load is about 15 cubic yards, with up to 1 tonne included.
  • Over 1 tonne: $160 per tonne.
  • Extra volume: $299 per quarter truck.
  • Concrete, brick, soil and shingles are quoted separately.

Why crews switch

No bin. No permit. No crew time spent loading.

Your crew stays on the job.

4-week minimum

4-week minimum, then cancel anytime. Pickups Monday to Saturday.

Questions from builders

How does a site manager start the plan?

Request it through the quote form with the address and what needs to go. We load it, haul it and dump it within 24 hours.

What is the difference between Basic and Pro?

Basic is $749 a week, with up to 2 pickups and up to 1 full truck load. Pro is $1,449 a week, with up to 4 pickups and up to 2 full truck loads, and is labeled Best for active sites. Loading and dump fees are included.

How is extra volume priced?

A full load is about 15 cubic yards, with up to 1 tonne included. Over 1 tonne is $160 per tonne. Extra volume is $299 per quarter truck.

Are concrete, brick, soil, and shingles included?

No. Concrete, brick, soil and shingles are quoted separately. There is a 4-week minimum, then cancel anytime. Pickups run Monday to Saturday.

Great projects start with a clean slate.

Try it for 4 weeks.

Free junk quoteBook