There is no single price to gut a basement in Toronto. The cost is the haul by truck volume, plus tear-out labour after the time included with a full load, plus weight and the carry when they apply. Drywall and carpet are not the same job as plaster and tile on mortar, and a walk-out to the driveway is not the same job as a turning stair. Every figure on this page is before HST. We confirm volume, access, and weight from photos, then in writing, before anything comes out.
Junk 'Of' Urs does that selective interior work across Toronto, York, and Durham, then hauls what comes out. We remove non-structural finishes. We do not remove load-bearing walls, beams, posts, foundation walls, or slabs, and we do not break out a slab or excavate for waterproofing. What that service includes is on the selective demolition page at junkofurs.com/services/selective-demolition. A kitchen uses the same labour-plus-haul model at junkofurs.com/blog/kitchen-demolition-cost-toronto, and a bathroom at junkofurs.com/blog/bathroom-demolition-cost-toronto. This guide is only about what moves a basement gut price.
What gutting a basement usually means
Gutting, for this price, is an interior soft-strip before a renovation or a second suite. The finishes come out. The structure stays. A typical scope takes drywall and plaster, a drop ceiling or a drywall ceiling, carpet and underlay, laminate or vinyl plank, old bathroom fixtures and a vanity, built-in shelving, and bar or kitchenette cabinets.
Stud partition walls come out only after your contractor or a structural engineer has confirmed in writing that they are not load-bearing. We do not make that call. Without that confirmation, the wall stays. We never remove a load-bearing wall, a beam, or a post.
Plumbing, electrical, and gas disconnects are for the right trades, arranged by the owner. A qualified plumber or a qualified electrician shuts those lines off and makes them safe before we open a wall or pull a fixture. We do not do that work.
Labour plus haul, not a flat basement price
A basement gutting cost is separate lines, all before HST: the haul by truck volume, tear-out labour after the time included with a full load, then weight and access when they apply. There is no basement package price on our card, and there is no price per square foot. A dry basement of carpet and drywall is not the same job as a plaster ceiling over a tiled floor.
Haul prices for light mixed renovation and demolition debris, before HST, are: a small pile $99 to $150, an eighth of a load $150 to $220, a quarter $250 to $400, a half $400 to $550, three quarters $550 to $700, and a full load of about 15 cubic yards $650 to $850. Each full load includes 60 to 90 minutes of loading and tear-out time. That included time is per full load. It is not an automatic promise on every partial load. The haul itself is priced by truck volume, not by the hour.
Tear-out labour after that included time is $100 to $150 per hour for a two-person crew. The rate covers pulling drywall, lifting non-structural studs, taking down a drop ceiling, rolling carpet, and carrying debris out. It does not cover plumbing, electrical, or gas work. Debris that is already curbside-ready can take a haul discount of 5 to 15 percent when it applies.
Tile on mortar, plaster, and other dense material in bulk go on the heavy schedule. A heavy call-out is $300 to $450, then about $100 to $160 per tonne after the allowance. If the load weighs more than the photos suggested, we re-quote from the scale ticket. Lighter drywall and carpet can still fill the truck, so weight and volume are separate lines.
Stairs, a basement carry, or a long carry to the truck add $50 to $150 or more. A walk-out with a clear path to the driveway is the simple case. An interior stair, a narrow or turning staircase, or a low ceiling that slows the carry is not.
Before the tear-out
Permits depend on the scope. Under the Building Code Act, the City of Toronto says a building permit is required for the construction or demolition of a new building, an addition, or a material alteration of any building or structure. The City's examples of work that require a permit include adding or removing walls in a way that changes room sizes or uses, installing or modifying plumbing, and demolishing or removing all or a portion of a building. Finishing a basement also needs a permit when the work includes those alterations, installing or modifying heating or plumbing, or adding a second suite. The City's examples of work that do not require a permit include finishing a basement when there is no structural or material alteration, no additional dwelling unit, and no new plumbing, and installation of cabinetry and millwork. The City says neither list is exhaustive. Confirm the scope with Toronto Building or your contractor before work starts. The City's page is at https://www.toronto.ca/services-payments/building-construction/building-permit/before-you-apply-for-a-building-permit/when-do-i-need-a-building-permit/. This is general information, not a permit decision.
Disconnects come before the crew opens a wall. A qualified plumber and a qualified electrician shut off water, electrical, and gas and make them safe. If those lines are still live, we do not pull a bathroom fixture or open a wall that hides them. A return trip is more crew time.
Older homes can hide hazardous material. Health Canada says asbestos may still be found in older building materials, including cement and plaster, floor and ceiling tiles, drywall, and insulation. Health Canada also says vermiculite-based insulation may contain asbestos. Have suspect material tested by a qualified professional before anything is opened, and do not disturb it. We do not test for, handle, or remove asbestos or any hazardous material. If asbestos is found, a qualified asbestos removal specialist has to remove it before any non-hazardous tear-out continues. The Health Canada page is at https://www.canada.ca/en/health-canada/services/air-quality/indoor-air-contaminants/health-risks-asbestos.html.
If there is significant mould, have a remediation specialist assess it first. A flooded basement, where the job is hauling wet carpet and drywall someone else has already cut out, is a different guide at junkofurs.com/blog/flooded-basement-cleanup-toronto. We do not dry a basement, and we do not do mould remediation.
What changes the price in a basement
Access is the part of a basement demolition cost that room photos miss. A walk-out to a driveway is simpler than an interior stair. A narrow or turning staircase, a low ceiling, and a long carry to the truck all add time. Parking for the truck matters too. If the truck cannot sit near the exit, the carry gets longer, and that uses the stairs and long-carry range above.
How much of the basement is heavy also moves the price. Tile on a mortar bed and plaster in bulk use the heavy schedule. A basement that is mostly drywall, studs, and carpet stays on the light mixed bands until the volume fills the truck.
Contents are a separate job. Furniture, boxes, and stored household junk are a basement cleanout, not a gut. Clear them first if you want the tear-out priced on the renovation debris lines above. The checklist is at junkofurs.com/blog/basement-cleanout-toronto, and the haul is at junkofurs.com/services/basement-cleanout. Household junk is priced by truck volume, not by the hour.
For contractors and property managers
Book the soft-strip and the haul as one visit so framing and the next trades walk into a clear basement. Send the scope, photos, the access notes, and the start date. A crew that tears out and hauls in the same visit avoids a bin sitting on the driveway. How a haul compares with a bin rental is at junkofurs.com/blog/junk-removal-vs-bin-rental-toronto.
The work stays interior and non-structural. Debris that is already down is hauled at junkofurs.com/services/demolition-debris-removal. Leftovers from a renovation that is already open are at junkofurs.com/services/renovation-debris-removal. A short definition of the tear-out is at junkofurs.com/blog/what-is-selective-demolition.
Example ranges, photos, and a written price
These are card ranges before HST. We confirm volume, access, and weight from photos, then in writing, before anything is removed. They are not a package price.
A basement of drywall, studs, and carpet often fills about half to a full truck. The half-load haul of light mixed debris is $400 to $550. A full load of about 15 cubic yards is $650 to $850. If the tear-out runs past the 60 to 90 minutes included with a full load, add $100 to $150 per hour for a two-person crew. Stairs or a long carry add $50 to $150 or more.
Plaster and tile on mortar use the heavy schedule: a call-out of $300 to $450, then about $100 to $160 per tonne after the allowance. A smaller pile of light mixed debris that is already down is haul only. A small pile is $99 to $150, an eighth is $150 to $220, a quarter is $250 to $400, and three quarters is $550 to $700, all before HST.
For a fast quote, send a wide shot of each room, the ceiling, the floor material, the stairs and the exit path, anything heavy, and the driveway or curb. Note what should stay, whether a qualified plumber or electrician has already made the utilities safe, and whether any wall is in the plan.
Send those photos for a written price at https://junkofurs.com/quote. If you need the tear-out itself, start at junkofurs.com/services/selective-demolition. Great projects start with a clean slate.
Frequently asked questions
- How much does it cost to gut a basement in Toronto?
- There is no single basement gut price. Before HST, light mixed haul runs from a small pile at $99 to $150 up to a full load of about 15 cubic yards at $650 to $850. An eighth is $150 to $220, a quarter is $250 to $400, a half is $400 to $550, and three quarters is $550 to $700. Labour past the time included with a full load is $100 to $150 per hour for a two-person crew. Tile on mortar and plaster start with a heavy call-out of $300 to $450, then about $100 to $160 per tonne. Stairs or a long carry add $50 to $150 or more. Photos turn that into a written price.
- What does gutting a basement include?
- Interior, non-structural finishes: drywall and plaster, ceilings, carpet, laminate or vinyl plank, bathroom fixtures and a vanity once they are disconnected, built-in shelving, and bar or kitchenette cabinets. Partition walls come out only after your contractor or a structural engineer confirms in writing that they are not load-bearing. We do not remove load-bearing walls, beams, posts, foundation walls, or slabs, and we do not excavate.
- Do you disconnect plumbing, electrical, or gas?
- No. The right trades do that first. A qualified plumber or a qualified electrician shuts off water, electrical, and gas before we remove fixtures or open a wall. We haul once those lines are safe.
- What if the basement might contain asbestos or vermiculite?
- We do not test for, handle, or remove asbestos or any hazardous material. Health Canada says older materials such as cement and plaster, floor and ceiling tiles, drywall, and insulation can still contain asbestos, and that vermiculite-based insulation may contain asbestos. Have suspect material tested by a qualified professional before anything is opened. If there is significant mould, have a remediation specialist assess it first.
- Is a basement cleanout the same as gutting the basement?
- No. A cleanout hauls stored furniture, boxes, and household junk, and that haul is priced by truck volume, not by the hour. A gut is the tear-out of finishes before a renovation. Hourly pricing on this page is tear-out labour only, at $100 to $150 per hour for a two-person crew after the time included with a full load. The cleanout checklist is a separate guide.
Soft-strip, demo and junk removal
Ready to clear the clutter?
6 years GTA experience. Send a quote, get your price, then book the pickup. You pay after the job is done. We reply Monday to Saturday, usually within 30 to 60 minutes.
